Southeast Missouri State University
Abe Stuber Track Resurface / Restoration A new synthetic resurfacing over existing sandwich surface at track oval; new aluminum track curbing; miscellaneous demolition; steeple chase water pit improvements; new concrete paving with synthetic surfacing and synthetic resurfacing over existing sandwich surface at high jump pad; new concrete paving and synthetic surfacing over new and existing concrete paving at javelin runway; and new concrete paving with synthetic surfacing and long / triple jump and pole vault runways.
Athletic Facility Feasibility Study Architectural / engineering services related to track house locker rooms, miscellaneous improvements at softball facility, tennis locker room in Houck Field House, and various areas in SRC-S.
Capaha Field Renovations Architectural / engineering services associated with improvements to Capaha Field located in Capaha Park. The proposed budget includes construction, design, and construction administration.
Houck Stadium Repairs Architectural / engineering services associated with the repair to the service drive located in Houck Stadium.
Baseball Proposal Study Architectural / engineering and planning services associated with the potential location of a NCAA competitive baseball facility located on campus in the proximity of the existing competitive softball facility.
Intramural Artificial Turf Replacement Architectural / engineering services associated with improvements to to the intramural field to the south and of the OVC softball field. These services shall include surveying and reconnaissance to determine existing conditions, design work associated with artificial turf for a combo field at the south location.
Tennis Courts Locker Room Preparation of bidding documents for the addition to the restroom building, located at the University Tennis Courts, for the locker room facility.
March Band Relocation Architectural / engineering services associated with improvements to the Marching Band Building. These services shall include reconnaissance to determine existing conditions and design work with renovation of the building at 416 Morgan Oak to house the Marching Band.
Success Center Architectural / engineering services associated with improvements to the Success Center located in the Student Rec Center South near Houck Stadium. These services shall include reconnaissance to determine existing conditions, and design work associated with the Student Rec Center South Building.
Houck Field Service Drive Repair Provide a drawing and specification for the removal and replacement of the track surface at Houck Stadium Field Service Drive.
Track Building Renovation Provide design for the renovation of the existing track building and the design of a stand alone storage building.
Athletic Facility Feasibility Study Architectural / engineering services related to track house locker rooms, miscellaneous improvements at softball facility, tennis locker room in Houck Field House, and various areas in SRC-S.
Capaha Field Renovations Architectural / engineering services associated with improvements to Capaha Field located in Capaha Park. The proposed budget includes construction, design, and construction administration.
Houck Stadium Repairs Architectural / engineering services associated with the repair to the service drive located in Houck Stadium.
Baseball Proposal Study Architectural / engineering and planning services associated with the potential location of a NCAA competitive baseball facility located on campus in the proximity of the existing competitive softball facility.
Intramural Artificial Turf Replacement Architectural / engineering services associated with improvements to to the intramural field to the south and of the OVC softball field. These services shall include surveying and reconnaissance to determine existing conditions, design work associated with artificial turf for a combo field at the south location.
Tennis Courts Locker Room Preparation of bidding documents for the addition to the restroom building, located at the University Tennis Courts, for the locker room facility.
March Band Relocation Architectural / engineering services associated with improvements to the Marching Band Building. These services shall include reconnaissance to determine existing conditions and design work with renovation of the building at 416 Morgan Oak to house the Marching Band.
Success Center Architectural / engineering services associated with improvements to the Success Center located in the Student Rec Center South near Houck Stadium. These services shall include reconnaissance to determine existing conditions, and design work associated with the Student Rec Center South Building.
Houck Field Service Drive Repair Provide a drawing and specification for the removal and replacement of the track surface at Houck Stadium Field Service Drive.
Track Building Renovation Provide design for the renovation of the existing track building and the design of a stand alone storage building.