Design and construction administration of a nine mile 16” diameter water transmission main. The project also included a 1 million gallon elevated water storage tank constructed of reinforced concrete and steel. Computer aided hydraulic analysis were performed to verify tank and line sizing. All surveying easement plats and staking were also performed by Hurst-Rosche Engineers, Inc.
Hurst-Rosche also assisted the water commission with the IEPA State revolving Fund application and implementation process.