|
Bridges over Streams |
L & N Railroad over Thompson Ditch
Terre Haute, IN
Description of Project:
- Loading: Coopers E-80, 3 Spans at 22' - 4"
- Temporary Timber falsework trestle included E-72 loading
- Scope of Work: Bridge replacements
|
Milwaukee Road Railroad over Thompson Ditch
Terre Haute, IN
Description of Work:
- Loading: Coopers E-80, 3 Spans at 22' - 8"
- Double track structure featuring staged construction
- Scope of Work: Bridge replacements
|
FA 805 (llinois Route 161) over Dutch Hollow Road
St. Clair County, IL
Description of Project:
- Dual four-span continuous, composite, welded plate girder bridges.
Spans: 95' - 0", 90' - 0", 90' - 0", 80' - 0". Deck width 92' - 8".
Special seismic design incorporating seismic isolation bearings: special
abutment design for negative skin friction loads. Pier height maximum
at 56'
- Scope of Work: TS&L development (alternative bridge
configurations and comparative estimates of cost), preliminary and
final design, special provisions, and estimate of construction cost
|
/images/blank.gif) |
|