Distribution Piping

Distribution Piping

Water Treatment Plant, Hillsboro, IL

Waterline Replacement
Hillsboro, Illinois

Prepared plans and specifications and construction observation for installation of approximately 30,000 lineal feet of 8-inch to 12-inch water mains to replace 2-inch and 4-inch waterlines, and to provide feeder lines for additional fire flows.

Waterline Replacement
Schram City, Illinois

Prepared plans, specifications and performed construction observation for replacement of approximately 3,500 lineal feet of 2-inch waterline with 6-inch waterline.

Sauget Industrial Park
Sauget, Illinois

Prepared plans and specifications for approximately 6,000 lineal feet of 12-inch waterline for new industrial park near Bi-State Airiport.

Pinnacle Point Subdivision
Glenn Shoals Lake
Hillsboro, Illinois

Prepared plans and specifications for approximately 20,000 lineal feet of 6-inch water main to serve new subdivision.

Illinois Route 127 Water Line Extension
Greenville, Illinois

Hurst-Rosche Engineers, Inc. is providing all standard engineering services for extension of an eight-inch water main south along Illinois Route 127 to a point just south of Greenville Airport, including project design, surveying, specifications, bidding supervision and bid recommendations, and engineering/ construction supervision.

White Subdivision
Hillsboro, Illinois

Prepared plans and specifications for approximately 5,000 lineal feet of 6-inch water main in new subdivision.

Water Survey
Commonfields of Cahokia, Illinois

Hurst-Rosche is currently preparing plans and specifications for the construction of a 24-inch waterline to supply treated water to the District from the St. Louis City water supply. The 24-inch water line will be placed under the Mississippi River by directional boring methods.

ADGPTV Water Commission
Treatment Systems Evaluation and Capital Improvement Feasibility Study

Study all treatment processes including raw water supply (impoundment) for treatment extensions, increased capacity, upgrade potential and related costs. The distribution system was also reviewed in terms of conveyance limits, pumping and telemetry controls. A three million dollar capital program was initiated as a result of this study as well as a treatment plant increased capacity rating by EPA.

ADGPTV Water Commission
Water Transmission Main and 1,000,000 Gallon Elevated Water Storage Tank

Design and construction administration of a nine mile 16” diameter water transmission main. The project also included a 1 million gallon elevated water storage tank constructed of reinforced concrete and steel. Computer aided hydraulic analysis were performed to verify tank and line sizing. All surveying easement plats and staking were also performed by Hurst-Rosche Engineers, Inc.

Well Supply and Distribution System
Raymond, Illinois

Raymond, a village of 950, receives water from a well supply. Hurst-Rosche has designed the wells, studied hydrology, and studied alternatives for new well locations all for the purpose of developing an additional municipal water supply resource. Hurst-Rosche has also been involved with well water treatment in Raymond with sequestration being the primary process used. Hurst-Rosche has designed several projects to extend 6-inch mains into new subdivisions and to serve commercial development.