| Rainfall, runoff and watershed investigations; flood
routing; design of dams, spillways and outlet structures, reservoirs;
drainage structures and systems; pumping stations and detention ponds;
harbor facilities; erosion control.
Cache River Bridge
Hurst-Rosche completed Phase I and Phase II work including preparation
of the Bridge Condition, Hydraulic, Structure and Project reports and
the preparation of the preliminary and final contract plans for the
replacement/rehabilitation of two highway/stream bridges.

Bridge over Cache River project (above left and right)
Southern Illinois University
Research Park
Carbondale, IL
Hurst-Rosche Engineers, Inc was selected to provide engineering
services for the development of a Research Park. The initial development
includes the design and construction of infrastructure improvements. It
will encompass four acres and require 300 to 400 foot extensions of
water, sewer, electric and telecommunication utilities as well as road
and parking lot construction. When completed the park will house a
minimum 12 buildings on 25 acres of land.

Research Park, Southern Illinois University, Carbondale, IL
Bridge over Cahokia Canal
Design/Build bridge over Cahokia Canal, project included reservoir / storage
routing, inlet spacing, storm sewers, and hydraulic gradeline analysis,
upstream of stormwater pump station.

Surface water runoff
Rehabilitation/Replacement of Storm and Sanitary Sewers and Pump Stations
City of East St. Louis, IL
Sewer repairs at eight different locations consisting of gunnite
repair of sewer line and manholes, excavation and replacement of sewer
line, dewatering, etc.
East St. Louis Pump Stations
East St. Louis, IL
Rehabilitation of 15 pump stations, upgrade sanitary sewer system, including
installation of bar screens.
MESD Route 203 Pump Station
Prepared plans, specifications, bidding, construction observation for the
installation of a duplex pump station, 1,200 gpm at 55’ at TDH and a 10”
diameter force main.
City of Hillsboro
Lagoon embankment reconstruction
Hillsboro, IL
This project for the reconstruction of the lagoon embankment consisted
of surveying and design for erosion control for large drainage area.
Flood Retention Reservoir & Discharge Structures
Southeast Drainage District
Terre Haute, IN
Construction of storm sewer system to relieve combined sewer system,
consisting of flood retention reservoir and related discharge
structures, 5,000 lineal feet of diversion ditch, four miles of
drainage ditch realignment, and 15,000 lineal feet of 24" - 84"
sewer. Engineering services included surveys, preliminary and
final plans, and construction engineering.
Race Horse Business Park
Alorton, IL
Designed, prepared plans and permit application for a new business park. Tasks
include subsurface analysis, surveying site layout, parking lot, roadways,
waterlines, sanitary sewer, pump station, storm sewer system,
including retention basin and landscaping.
|