Home
Home  >  Services  >  Water Resources Engineering  >  Surface Water Management  >  Hydraulics and Hydrology
Hydrologic / Hydraulic Studies

Hydraulics and Hydrology

Rainfall, runoff and watershed investigations; flood routing; design of dams, spillways and outlet structures, reservoirs; drainage structures and systems; pumping stations and detention ponds; harbor facilities; erosion control.

Cache River Bridge

Hurst-Rosche completed Phase I and Phase II work including preparation of the Bridge Condition, Hydraulic, Structure and Project reports and the preparation of the preliminary and final contract plans for the replacement/rehabilitation of two highway/stream bridges.

Bridge over Cache River      Bridge over Cache River
Bridge over Cache River project (above left and right)

Southern Illinois University
Research Park
Carbondale, IL

Hurst-Rosche Engineers, Inc was selected to provide engineering services for the development of a Research Park. The initial development includes the design and construction of infrastructure improvements. It will encompass four acres and require 300 to 400 foot extensions of water, sewer, electric and telecommunication utilities as well as road and parking lot construction. When completed the park will house a minimum 12 buildings on 25 acres of land.

Southern Illinois University, Research Park
Research Park, Southern Illinois University, Carbondale, IL

Bridge over Cahokia Canal

Design/Build bridge over Cahokia Canal, project included reservoir / storage routing, inlet spacing, storm sewers, and hydraulic gradeline analysis, upstream of stormwater pump station.

Surface water runoff
Surface water runoff

Rehabilitation/Replacement of Storm and Sanitary Sewers and Pump Stations
City of East St. Louis, IL

Sewer repairs at eight different locations consisting of gunnite repair of sewer line and manholes, excavation and replacement of sewer line, dewatering, etc.

East St. Louis Pump Stations
East St. Louis, IL

Rehabilitation of 15 pump stations, upgrade sanitary sewer system, including installation of bar screens.

MESD Route 203 Pump Station

Prepared plans, specifications, bidding, construction observation for the installation of a duplex pump station, 1,200 gpm at 55’ at TDH and a 10” diameter force main.

City of Hillsboro
Lagoon embankment reconstruction
Hillsboro, IL

This project for the reconstruction of the lagoon embankment consisted of surveying and design for erosion control for large drainage area.

Flood Retention Reservoir & Discharge Structures
Southeast Drainage District
Terre Haute, IN

Construction of storm sewer system to relieve combined sewer system, consisting of flood retention reservoir and related discharge structures, 5,000 lineal feet of diversion ditch, four miles of drainage ditch realignment, and 15,000 lineal feet of 24" - 84" sewer. Engineering services included surveys, preliminary and final plans, and construction engineering.

Race Horse Business Park
Alorton, IL

Designed, prepared plans and permit application for a new business park. Tasks include subsurface analysis, surveying site layout, parking lot, roadways, waterlines, sanitary sewer, pump station, storm sewer system, including retention basin and landscaping.

Employment  |  Contact  |  Project/Bid Information  |  Resources
Copyright 2008 Hurst-Rosche Engineers, Inc.