|
Location Studies
|
US Rt. 150
Phase I, PSB 88-018
McLean County, Bloomington,IL
This project includes location and design report for the reconstruction
of US 150 from Business Loop I-55 to Oakland Ave in Bloomington. Additional
work included preparation of an Intersection design study for the
intersection for US 150 at LaFayette.
|
IL Rt. 159 Widening
Madison and St. Clair counties, IL
Environmental Impact Statement for 18 miles of IL Rt. 159. The EIS
included assessment of wetlands, endangered or threatened species,
mitigation of wooded areas, archeological significance. Along with other
minor issues such as notice and air impacts. Preparation of preliminary
design plans.
|
FA Rt. 42 (IL 127)
Phase I
Montgomery County, Hillsboro, IL
This project consisted of surveying for the widening of Rt. 127 in
Hillsboro from Wood St., to new MOPAC overpass south Rt. 127. Phase I
included location/design report, resurfacing, storm sewers,
intersection improvements including traffic signals.
|
 |
|