Hurst-Rosche Engineers, Inc. has several years experience in performing cost
analysis/feasibility studies, electrical protection device studies and
electrical distribution centers.
|
Lighting examples:
|
Mid-America Airport Passenger Terminal
St. Clair County, IL
The project consisted of interior designing of the terminal facility, lighting
and electrical systems, heating and ventilating systems, finish grading
adjacent to the building, lightning arrestor system, fire alarm and
sprinkler system, two baggage handling systems, two aircraft passenger
loading bridges, specifications of material testing for quality assurance
during construction, and the fixtures, furniture and equipment.
|
|

Mid-America Airport Terminal |
|
New Jersey Community High School
Jersey C.U.S.D. 100
Jerseyville, IL
Provide all Architectural / Engineering and construction administration
services for a 220,000 square foot facility. This project includes an
auditorium that seats approximately 400 persons. The middle “T” shaped
classroom wing with curved front façade includes 45 classrooms, media center,
study hall lecture room, and computer labs, and audio / video lab, cafeteria,
full service kitchen, multi-purpose room, two large gymnasiums with two courts
each, a multi-purpose room, weight room, locker rooms, administration and
guidance blocks, and all related storage and faculty spaces. Site development
includes new physical education fields, new running track, six new tennis
courts, and segregated student and faculty parking lots. This project
includes a fire alarm and sprinkler system.
|
Grafton Elementary School
Jerseyville, IL
Provided A/E services for the design and construction of a new elementary
school consisting of 47,000 square feet of space. The design is unique in
the fact that the classrooms are on two floors with an elevator for
handicap accessibility. The building has a large circular lobby area,
reception area, offices, conference room and large nurses office. It also
has a cafeteria, library, music room, computer lab and gymnasium and 14
classrooms with an additional 10 classrooms on the second floor with
faculty area, art room and restrooms. This project included fire alarm,
paging system, and fire sprinkler system.
|
Mt. Vernon Courthouse
Expand courthouse annex
Mt. Vernon, IL
Hurst-Rosche provided design services for a new two story,
8,000 sq. ft. masonry addition with freight elevator, all related
electrical and mechanical to accommodate office, library, restrooms,
storage space and parking garage.
|
Hillsboro Sports Complex
Hillsboro, IL
Design of 20 acre sports complex including concession stand, softball
diamonds and dugouts, appurtenant sports lighting, plumbing,
mechanical/electrical.
|
New Hope School
Fairfield, IL
This project included an electrical distribution system, new windows,
asbestos abatement along with geothermal heating and cooling system and
conventional HVAC systems.
|
SIU-E
Dunham Hall exhaust
Edwardsville, IL
Provided A/E services to prepare plans and specifications for the
installation of an exhaust system in the scene preparation area serving
the theater in Dunham Hall. This exhaust system was 4000 CFM’s and runs
continuously in the occupied time period.
|
Wirth Middle School
Cahokia, IL
Hurst-Rosche provided engineering services for the construction of a new
addition totaling 33,800 sf including science labs, art labs, and a computer
based information training center and library.
|
Kickapoo State Park
Renovate campgrounds & day use improvements
Vermillion, County, IL
Cahokia, IL
A/E services include removal and replacement of roads, camp sites, and
electrical distribution system; construction of new roads, sites, shower
building, check station, and recreational areas. ADA compliance.
|
Graham Correctional Center
Facility upgrade; building automation system
Hillsboro, IL
All engineering design services for installing a new computer
controlled HVAC & fire alarm system together with fiber optic cables.
|
 |
 |
 |
|