Sewage Collection Systems
Water and Sewer Projects |
 |
Project No. 10, Sanitary Collection Lines
Terre Haute Sanitary District
Terre Haute, IN
Construction of 71,400 lineal feet of 8" - 12" sanitary sewer in urban
areas to serve unsewered residential areas together with necessary pump
stations. Engineering services included surveys, preliminary and final
plans, and construction engineering. |
|
 |
Project No. 11, Sanitary Collection Sewers
Indiana Sanitary District
Terre Haute, IN
Construction of 94,300 lineal feet of 8" - 12" sanitary sewer in urban
areas to serve unsewered residential areas plus 10,000 lineal feet of 36"
interceptor sewer with necessary pump stations. Engineering services
included surveys, preliminary and final plans, and construction
engineering. |
|
 |
Project No. 12, Sanitary Sewer Extensions
Indiana Sanitary District
Terre Haute, IN
Construction of 98,700 lineal feet of 8" - 42" sanitary sewer in urban
areas with nine pump stations, 323 manholes and other appurtenant work.
Engineering services included surveys, preliminary and final plans, and
construction engineering. |
|
 |
Alorton-Centreville Sanitary
Sewer System, Phase I
Construction of sanitary sewer line as follows: 53,700 lineal feet of 8";
2,200 lineal feet of 10"; 1,200 lineal feet of 12"; and 1,100 lineal feet of
other appurtenances. Engineering services included surveys, preliminary
and final plans, and construction engineering. |
|
 |
Sanitary Sewer System
Hillcrest Areas
Hillsboro, IL
Construction of approximately 12,000 lineal feet of sewer line and one
pump station to serve a residential area. |
|
 |
Recent Sewage Collection and Treatment Projects (1996 – 1998) |
|
 |
Wilson Street Sewer Extension
City of Girard
Construction Cost: $65,000
Hurst-Rosche provided design, bidding and construction administration
services for construction of a sanitary sewer on Wilson Street form Center
to North Streets. The project was completed in April,1999. |
|
 |
Sewer Line
Fairway Heights/Lakeside Knolls
Hillsboro, IL
Construction Cost: $388,000
Hurst-Rosche prepared plans and specifications and an IEPA permit
application for the installation of a pump station, 27 manholes, force
main and 7,340 lineal feet of gravity sewers in the Lakeside Knolls
subdivision. The project was completed in June, 1996. Hurst-Rosche provided
construction administration and observation. |
|
 |
Sanitary Sewer Extension
Industrial Park
Greenville, IL
Construction Cost: $43,545
This project included development of the plans and specifications
required to complete the installation of 1,078 feet of 15-inch sanitary
sewer line and four manholes which will serve a commercial building
located at the city’s industrial park, with discharge to an existing
15-inch sanitary sewer tributary to the Greenville Sewage Treatment Plant.
Project was completed in December, 1996. |
|
 |
Water and Sewer Extension
White/Edgewood Subdivision
Hillsboro, IL
Construction Cost: Approximately $100,000 (by developer)
The plans and specifications were prepared to construct a lift station
having two pumps with a rate capacity of 80 gpm at 38 feet of TDH, 1,560 feet
of 4-inch force main, 1,340 feet of 8-inch sanitary sewer, and
six manholes to serve 75 single family dwellings located at Seymour
Avenue and FAS Route 725, with discharge to an existing 8-inch sanitary
sewer tributary to the Hillsboro Sewage Treatment Plant. |
|
 |
Water and Sewer Line Extension
Southern Meadows 1st Addition
Raymond, IL
Construction Cost: $20,000
This project included development of the plans and specifications and
obtaining the IEPA permit required to complete the installation of 630
feet of 8-inch sanitary sewer line and two manholes to serve six single
family dwellings and four multiple family dwellings located at Southern
Meadows 1st Addition with discharge to an existing 8-inch sanitary sewer
tributary to the Raymond Sewage Treatment Plant. |
|
 |
Emergency Sanitary Sewer Repairs
IL Route 157
Commonfields of Cahokia, IL
Construction Cost: $213,000
Hurst-Rosche prepared the plans and specifications for the repairs of
the sanitary sewers, manholes, Highway 157, and Carol and Calvin
Streets. The sewer repairs included the replacement of approximately
150 feet of 8-inch and 18-inch sewer line, along with the replacement
of two 12 foot - 14 foot manholes. The project also included 700
cubic yards of backfill, four by-pass systems, groundwater dewatering and
pavement restoration. Project was completed in September, 1996. |
|
 |
 |
 |
 |
|