Sewer Systems and Pumping Stations |
 |
Corps of Engineers
VA Pump Station
Fort Belvoir
This project included the field investigation, study and preparation of
contract documents for the rehabilitation of three (3) sewage pumping
stations. Hurst-Rosche inspected the pump stations and developed
as-built drawings on one of the pump stations. Architectural,
structural, mechanical, and electrical modifications were made
to all three of the pump stations.
The work included:
- Concrete and structural steel rehabilitation
- Updating all ventilation systems to safety code requirements
- Replacing pumps, motors, valves and controls
- Upgrading the equipment
- Rehabilitating the roofing on one pump station
- Replacing doors and windows; along with adding safety equipment
|

Sewer Systems and Pumping Station
|
 |
Other Pumping Stations |
|
 |
Sanitary Sewer Pumping Treatments
Cahokia, IL
Design of four million gallon per day pumping station with automatically
operated sewage screening machine. Project also consists of telemetering,
metering and high voltage electrical service. |
|
 |
Rehabilitation and replacement of storm and sanitary sewers
and pump stations
Phases I and II
East St. Louis, IL
Sanitary sewer repairs at eight different locations in the City of East St.
Louis, consisting of gunite repair of approximately 4,600 lineal
feet of 66" - 84" sewer line and 13 manholes; excavation and replacement
of approximately 440 lineal feet of sewer line, 78" - 84" in diameter;
excavation and replacement of approximately 3,490 lineal feet of 8" - 35"
sewer line, some of which required dewatering; cleaning, televising, and
grouting of joints of approximately 17,120 lineal feet of 8" - 36" sewer
line; and the replacement of pumps, controls and auxiliary generators at
three pump stations. Engineering services included, surveys,
preliminary and final plans, and construction engineering. |
|
 |
Pump Station Rehabilitation
East St. Louis, IL
Rehabilitation of 22 sanitary sewer pumping stations including replacement
of pumps valves and controls. |
|
 |
Rehabilitation of sanitary sewer and construction
of
interceptor sewer
Cahokia, IL
Construction Cost: 4,093,280
This project consists of lining approximately 17,500 lineal feet of
existing 8-inch to 30-inch Sanitary Sewer. The project also includes the
construction of a 2400 GPM lift station and 16,000 L.F. of 18-inch force
main. Sewer repairs by excavation are to be made at two locations and
four existing pump stations are to be rehabilitated. Design is 100% complete
with construction scheduled to start in March 1999 and was completed on
December 1999. |
|
 |
Sewer line improvement and water line extension
Greenville, IL
Water Lines Construction Cost: $1,299,360
Improvements to the sewage collection system include 1,307 lineal feet
of 15-inch force main and one pump station. Engineering services include
the design of drawings, specifications and bidding documents in connection
with the improvements to the water and sewage system on the city’s
existing system. Hurst-Rosche is also providing construction
administration and observation. Project was completed in June, 1997. |
|
 |
 |
 |
 |
|