Parking and Traffic Infrastructure Repairs and Enhancements

Hurst-Rosche completed engineering services necessary to provide the University with a Program Analysis with construction phasing recommendations, life-cycle costing and cost estimates for the infrastructure repairs and enhancements associated with the Edwardsville, Alton, and East St. Louis campuses.

Areas of concern were upgrading the parking lots, parking lot lighting, pedestrian crossings, security systems, and signage. Improvements to be constructed are estimated to be $7 million. Construction Administration services included the preparation of bidding documents, assistance with the bidding process and selection of contractor.

Fan Parking Lot Resurfacing

The parking areas and roadways comprising the fan-shaped parking lot were constructed approximately 30 years ago, some of which were originally designed by Hurst-Rosche. The project included resurfacing ten asphalt parking areas, walkways and two roadways; construction of new curbing; improvements to the storm drainage system; installation of an emergency telephone system; sealing and pavement markings; enhancements to traffic control and regulatory signage; and application of crack-control fabric underlayment. Work was accomplished in phases and completed as parking and traffic revenues became available.

Medians at ticket booth
Medians at ticket booth

New curbing
New curbing

Parking lot
Parking lot

Parking lot
Parking lot


New curbing
New curbing


Additional Parking Lot Projects

  • Parking Service office at Rendleman
  • Parking Lot Analysis of Lot F
  • Parking for Cougar Village Housing
  • Cougar Village Parking expansion
  • Prairie Hall Parking Lot & Expansion
  • Turn lane at Cougar Rd & University Dr.
  • Bluff Hall Parking Lot Expansion
  • Bluff Hall Sidewalk expansion
  • New Parking Lot (Lot E5)
 
  • Campus Guardrail evaluation
  • Sidewalk from Bluff Hall to Parking Lot E
  • Roadway overlaying of P2 Road
  • Hairpin Drive modifications
  • Yellow Hammermill Rd. Survey
  • Parking Lot striping
  • Additional Parking at Hairpin Dr .
  • Asphalt Testing
  • P-2 Roadway Pavement Design