The Bank of Herrin needed additional space and wanted a new
look, so Design Architects, Inc. designed a second story. The approximately
8,200 square feet addition is not planned for a second floor, remodeling
of the main banking floor and mechanical electrical work in the basement
was required as well as renovated teller stations, drive up equipment,
ATM and relocation of the night drop box. The exterior clock on the side
of the existing building was also worked into the design.
|
|

Bank of Herrin (before)

Bank of Herrin (after) |
|

|
Morrisonville Facility
Morrisonville, IL
Hurst-Rosche completed plans and specifications for the design of a
1,500 sf banking facility, which also included ADA design. Hurst-Rosche also
performed construction administration services which included shop drawing
review, pay requests/approval, lien waivers and on-site inspections.
|
National Bank of Raymond
Girard Banking Center
Girard, IL
Hurst-Rosche completed plans and specifications for the design of a
1,500 sf banking facility, which also included ADA design. Hurst-Rosche also
performed construction administration services which included shop drawing
review, pay requests/approval, lien waivers and on-site inspections.
|
Johnston City State Bank
New facilities
Johnston City, IL
David Pool and Paul Whitney, while employed with a different firm acted
as principal designer and detail manager on a branch banking facility. Mr.
Pool’s responsibilities included conceptual, schematic, and final design
and oversight of construction documents. Mr. Whitney, production manager,
handled the detailed design and specification coordination.
|
1st National Bank & Trust
Upper floor additions & alterations
Carbondale, IL
David Pool and Paul Whitney, while employed with a different firm acted as
principal designer and detail manager on a major bank expansion project. Mr.
Pool’s responsibilities included conceptual, schematic and final design as
well as coordination with the furniture and interior consultant. Mr. Whitney,
production manager, handled the detailed construction documents and